Athens-Clarke County's Technical Standards allow porous pavements to reduce impervious site coverage and the volume of runoff a project has to control, so permeable resin-bound surfacing can be proposed for a stormwater role here when it's built as a porous pavement system: a resin-bound surface over Rock Crete or another permeable base and an engineered open-graded stone reservoir, with an underdrain where clay subsoils drain slowly. County reviewers decide whether it counts as porous pavement. Laid over existing concrete, it's a finish and nothing more.
The County also runs a stormwater utility that has billed by impervious area since 2005, with credits for qualifying on-site facilities. That gives owners two reasons to look closely at how a permeable surface is designed and documented.
The Technical Standards, the stormwater ordinance and where porous pavement fits
Development in Athens-Clarke follows Chapter 5-4 of the County Code (Stormwater Management) and the Transportation and Public Works Department's Technical Standards, dated December 2023, which adopt the Georgia Stormwater Management Manual and apply the more stringent requirement where documents overlap. The minimum water quality standard is to treat runoff from 1.2 inches of rainfall, with no impervious runoff bypassing treatment, and to cut post-development total suspended solids by 80 percent on an average annual basis.
Porous pavements get their own paragraph. They may be used to reduce impervious site coverage and runoff volume, must use a runoff curve number of at least 61 in hydrologic calculations, and are designed following Bruce K. Ferguson's Porous Pavements. A resin-bound system has to be presented within that framework, and the County's Stormwater Management Program decides how it's credited.
Piedmont clay, the Oconee rivers and what they mean for the base
Athens sits in Georgia's Piedmont, where clay subsoils and weathered rock often drain slowly. A permeable section can still store the water quality volume in its stone reservoir, but the engineer will usually pair it with an underdrain or controlled outlet and size the reservoir from infiltration tests taken at its base. The County standards set a minimum curve number of 61 for porous pavement in runoff calculations, so the design can't assume it absorbs all the rain that falls on it.
Local streams feed the North and Middle Oconee rivers, and the County applies a riparian credit automatically to the quantity portion of the fee for eligible streamside properties. Sloped lots near creeks call for checked or terraced reservoirs, and construction falls under the County's soil erosion and sedimentation control chapter, so plan silt control while the base is open.
Where it fits in Athens
- Student housing and apartments near the University of Georgia: walks, courtyards and parking stalls on sites where impervious area drives the monthly fee.
- Five Points, Normaltown and Boulevard homes: driveways and paths on older lots with mature trees.
- Downtown Athens: restaurant and bar courtyards and patios at grade.
- Churches, schools and offices: low-speed parking paired with conventional drive aisles.
- Creekside sites: projects where reducing runoff volume helps protect stream banks.
Getting it approved in Athens-Clarke, and Resin Rock's role
Plans go to the Stormwater Management Program within Transportation and Public Works, which handles land development review. For a fee credit, a licensed professional engineer evaluates the facility against current County design standards and the owner files an Adjustment Review Request. Credits mainly reduce the quantity and quality portions of the fee. County code also offers a 20 percent credit for facilities designed to infiltrate 1 inch of rain through green infrastructure, which can be added to other credits. Approval and any credit are the County's decisions.
Resin Rock supplies the binder, stone blends, trims and Rock Crete permeable sub-base, with technical data sheets for the engineer. We don't install. We train installers through Georgia installer training and match Athens owners with an approved installer on request, usually within 24 hours.
Before you specify permeable resin-bound in Athens
- Treat runoff from 1.2 inches of rain and show the 80 percent TSS reduction.
- Use a curve number of at least 61 for the porous pavement area.
- Test infiltration at reservoir depth and plan an underdrain for clay.
- Design to Ferguson's Porous Pavements, the reference the County names.
- Prepare a PE evaluation and Adjustment Review Request if seeking a fee credit.
- Plan erosion and sediment control while the base is open.
Common questions about permeable resin-bound in Athens
How does Athens-Clarke calculate the stormwater fee?
By impervious area. One Equivalent Runoff Unit is 3,000 square feet; single-family homes fall into small, medium or large tiers by impervious area, and commercial parcels pay on exact impervious square footage. The monthly charge combines a base rate, a quantity rate and a quality rate that is multiplied by a water quality factor set by land use.
Can a permeable surface earn a fee credit?
Possibly. The County offers quantity and quality credits for qualifying stormwater facilities, evaluated by a licensed professional engineer against County design standards and requested through an Adjustment Review Request. County code also offers a 20 percent credit for facilities designed to infiltrate 1 inch of rain through green infrastructure, on top of other credits. Whether a resin-bound system qualifies is the County's decision.
Is porous pavement allowed in Athens site plans?
Yes. The County's Technical Standards say porous pavements may be used to reduce impervious site coverage and the volume of runoff to be controlled, using a minimum curve number of 61 and Ferguson's Porous Pavements as the design reference. Your engineer still has to show the site meets the 1.2-inch water quality treatment standard.
Can resin-bound go over my existing concrete driveway in Athens?
Yes, as a resurfacing, and plenty of owners choose it for looks. But the concrete stays, so rain passes through the resin-bound layer and runs off the slab as before, and the County would still see impervious area. To get stormwater value, the slab is removed and an engineered porous pavement section with a stone reservoir goes in.
Official sources for Athens
- Athens-Clarke County Technical Standards (Transportation & Public Works)
- Athens-Clarke stormwater utility credits
- Athens-Clarke stormwater fee calculation
- Athens-Clarke Land Development Program
Local rules change. We last checked these sources in October 2026. Confirm current requirements with the reviewing agency before you design, and treat this page as a starting point, not engineering or permitting advice.