Permeable Resin-Bound Surfacing in Bethesda / Montgomery County, MD

Permeable resin-bound surfacing in Bethesda and Montgomery County: WQPC credits up to 80%, the paver-only RainScapes rebate and Piedmont soil checks.

Permeable resin-bound surfacing can be part of a stormwater design in Bethesda and the rest of unincorporated Montgomery County when it sits on an open-graded reservoir that infiltrates or drains through an underdrain, and when the county accepts it as permeable pavement in the plan or credit application. The main payoff is the Water Quality Protection Charge credit; the county's RainScapes rebate, as written, covers only certified permeable concrete pavers.

A resin-bound overlay on an existing driveway or plaza slab doesn't count; it looks porous but sends water off the edge as before. Montgomery County is also not one jurisdiction for this purpose. Rockville, Gaithersburg and Takoma Park run their own programs, so this page covers Bethesda, Chevy Chase, Potomac, Kensington, North Bethesda and similar county areas.

The Water Quality Protection Charge credit and the RainScapes rebate

The Department of Environmental Protection (DEP) bills the Water Quality Protection Charge (WQPC) on impervious area with property taxes. Permeable pavement is on DEP's list of eligible practices, and the credit is based on the volume of water a practice captures. Multifamily and nonresidential properties can earn up to 60% off where environmental site design (ESD) and conventional systems together treat the site, and up to 80% where the property is fully treated by ESD. Credits are renewed every three years, and applications are due September 30.

The separate RainScapes permeable pavement retrofit rebate pays $14 per square foot of existing impervious surface replaced, with a 100-square-foot minimum for homes and 200 square feet for commercial and institutional sites, up to a maximum of $7,500 per residential parcel and $20,000 for commercial, HOA, multifamily and institutional parcels. As written, the rebate requires permeable interlocking concrete pavers installed by a contractor certified for them through the Concrete Masonry and Hardscapes Association (CMHA), built to the RainScapes Permeable Paver Manual or the county's paver specifications. A resin-bound surface would qualify only if RainScapes grants an exception, so ask before you build, not after.

Piedmont soils, steep stream valleys and a dense downtown

Bethesda sits on Piedmont ground: weathered schist and gneiss under silty, mica-rich soils, with infiltration that ranges from useful to poor over short distances. Little Falls Branch, Willett Branch and Cabin John Creek cut steep valleys toward the Potomac, and the east side drains to Rock Creek. Maryland's ESD criteria for permeable pavement want soils in Hydrologic Soil Groups A, B or C, a surface that passes at least eight inches of water per hour, and slopes no steeper than 5%, with terracing on steeper grades.

MDE's subbase is clean, washed, open-graded stone of about 30% porosity, typically 6, 9 or 12 inches thick, with no filter cloth between subbase and soil subgrade. Shallow rock or saprolite on some lots limits depth, and that is where the project engineer may trade reservoir depth for an underdrain. Downtown Bethesda parcels are nearly all redevelopment sites, where existing impervious area inside the limit of disturbance sets the treatment target.

Snow and freeze-thaw are routine. MDE's maintenance guidance asks for at least two vacuum sweepings a year, plow blades set an inch higher than normal, and no plowed snow piles on the permeable surface.

Where permeable resin-bound fits across Bethesda and the county

  • Single-family driveways and front walks in Bethesda, Chevy Chase and Kensington, where a design DEP accepts could earn a WQPC credit, though the RainScapes rebate as written covers only certified permeable pavers.
  • Courtyards, plazas and through-block walkways in downtown Bethesda and the Pike District, where redevelopment projects need treatment inside tight footprints.
  • HOA common areas in Potomac and Olney, such as paths, pool surrounds and overflow parking.
  • Private schools, places of worship and office parks in Rock Spring and along Rockville Pike, where large paved areas drive the WQPC bill.

DPS concept review, DEP credits and how Resin Rock supports the submittal

For development, the Department of Permitting Services (DPS) reviews the stormwater management concept, and that approval comes before the Planning Board acts on a preliminary plan. Anything other than a single-family house on a residential lot generally needs one, and sites in a Special Protection Area follow added water quality plan steps. Credits and rebates for existing properties are handled by DEP, separately from permitting.

Resin Rock is a manufacturer-supplier, not an installer. We supply the UV-stable binder, natural stone blends, trims and the Rock Crete permeable sub-base, plus technical data sheets your engineer can attach to a DPS or DEP submittal. We train and approve installers, and through find an installer we usually match a Montgomery County project with one within 24 hours. Contractors who want to add the system can start with our Maryland installer training.

Before you specify permeable resin-bound in Montgomery County

  • Confirm the property is in unincorporated Montgomery County, not Rockville, Gaithersburg or Takoma Park.
  • Ask DEP, before construction, whether a resin-bound surface course qualifies as permeable pavement for the WQPC credit.
  • Check soils against MDE's HSG A, B or C requirement and test infiltration on site.
  • Plan reservoir depth around shallow rock or saprolite, adding an underdrain where needed.
  • Calendar the September 30 WQPC credit deadline and the three-year renewal.
  • Write a sweeping and winter plan that keeps plowed snow off the surface.

Common questions about permeable resin-bound in Montgomery County

Can a resin-bound driveway in Bethesda get the RainScapes rebate?

Probably not as the program is written. The rebate pays $14 per square foot for permeable pavement retrofits, but it requires permeable interlocking concrete pavers installed by a CMHA-certified contractor to the county's paver manual or specifications. A resin-bound driveway would need an exception from RainScapes, so ask before installation; an overlay on your existing driveway would not qualify in any case.

How much can a permeable surface cut my Water Quality Protection Charge?

It depends on the runoff volume the practice captures. DEP offers up to 80% off when a property is fully treated by environmental site design practices, and up to 60% where ESD and conventional systems combine. Multifamily and commercial applications need engineer-certified documentation, and every credit must be renewed every three years.

Does this apply in Rockville or Takoma Park?

No. RainScapes is open to properties outside Rockville, Gaithersburg and Takoma Park, and those cities run their own stormwater fees and programs. If your property is in one of them, check the city's credit rules; Takoma Park, for example, names specific permeable pavement types and reservoir requirements.

Official sources for Montgomery County

Local rules change. We last checked these sources in October 2026. Confirm current requirements with the reviewing agency before you design, and treat this page as a starting point, not engineering or permitting advice.

How a permeable resin-bound build-up handles rain

The surface you see is only the top layer. Whether a resin-bound area works as permeable pavement depends on everything underneath it.

  1. Resin-bound wearing course. Natural aggregate coated in UV-stable resin and hand troweled. Rain passes through the open voids between the stones.
  2. Permeable base. An open-graded base, designed by the project engineer, that carries the load and keeps water moving down. Ask us where Rock Crete fits your build-up.
  3. Stone reservoir. Clean, open-graded stone sized to hold the design storm while it soaks away.
  4. Subgrade or underdrain. Water infiltrates the native soil, or leaves through a perforated underdrain where soils are tight or groundwater is high.

Laid straight over solid concrete or asphalt, resin-bound still drains through its own surface, but the water then runs off the slab beneath it. That is a resurfacing job, not a stormwater control, and it should not be submitted as one. Product details are in our technical data sheets.

Cross-section of a permeable resin-bound build-up Rain passes down through four numbered layers: the resin-bound wearing course, a permeable base, a stone reservoir, and the native subgrade with an optional underdrain. 1 2 3 4
Illustrative only. Layer depths, the reservoir and any underdrain are set by the project engineer for each site.

Send us the site plan for your Bethesda / Montgomery County project

Share the area, the use and what your reviewer needs. We will confirm the resin-bound system, send the data sheets and put you in touch with an approved installer.