Hartford's zoning regulations list permeable surfaces among the low impact development measures applicants should use where feasible, so a permeable resin-bound section can be part of a compliant stormwater plan, provided it sits on a permeable base such as Rock Crete over an open-graded reservoir and is designed to the Connecticut Stormwater Quality Manual. Over an existing slab it is a finish only.
Two drainage systems sit under the city. Hartford runs a municipal separate storm sewer under the state MS4 permit, while the Metropolitan District (MDC) operates a combined sewer system that it is separating as part of its Clean Water Project. Where your runoff ends up decides who reviews the design.
Section 6.14, the state manual and MDC sign-off
Under Section 6.14 of the zoning regulations, no zoning permit may allow untreated runoff to be channeled into ground or surface waters, or peak discharges from the 2, 10, 25 and 100-year storms to exceed pre-development rates. Stormwater systems must follow the latest Connecticut DOT Drainage Manual and Stormwater Quality Manual, and applicants must use low impact development wherever feasible; the listed options include permeable surfaces, bioretention, infiltration trenches and green roofs. The water quality volume has to be treated on site, and any system that outlets to an MDC-controlled drain must meet MDC standards and approvals.
Freestanding one-, two- and three-unit dwellings outside a larger plan, and disturbance under 2,500 square feet that is not part of a larger plan, are exempt from the stormwater plan requirement. The 2024 state manual raised the water quality storm from 1 inch to 1.3 inches and classes permeable pavement as an infiltration practice. Connecticut's MS4 general permit is administratively extended while DEEP reissues it.
River clays, a buried river and an overloaded combined system
Hartford sits on the Connecticut River floodplain behind flood-control dikes, with the Park River carried in conduits beneath the city. Much of the subsoil is fine-grained glacial lake sediment that drains slowly, so many permeable sections here will need an underdrain, and the engineer should present those as filtration and peak control rather than retention.
The combined sewer is the other driver. MDC's Clean Water Project includes separating Hartford's combined pipes, cutting inflow from downspouts and sump pumps, and the South Hartford Conveyance and Storage Tunnel, and North End neighborhoods have struggled with basement backups. A section that infiltrates keeps rain out of those pipes; one piped to the combined system needs MDC approval. For cold-weather performance, the state manual says not to sand permeable pavement, and for porous asphalt and pervious concrete it calls for pavement plus subbase thicker than 0.65 times the design frost depth.
Where it fits in Hartford
- Tree surrounds in new development: Section 6.2.3 calls for at least 70% of the canopy limits of preserved trees to have a permeable surface. A bound, permeable finish over structural soil is a candidate, subject to zoning staff acceptance.
- Office and insurance campuses: surface lots and plazas downtown and in Asylum Hill, where any redevelopment disturbing 2,500 square feet or more needs a stormwater plan.
- Multifamily courtyards: buildings of four or more units in Frog Hollow, Parkville and the South End rebuilding their outdoor space.
- School and park paths: walks where a firm permeable surface can replace worn asphalt.
Approvals in Hartford and what Resin Rock provides
Site plans and stormwater management plans go to the Planning and Zoning Commission or zoning staff in Development Services, with MDC review for any connection to its system. Expect reviewers to want infiltration testing, a long-term operation and maintenance plan under the state manual, and proof that the water quality volume is treated on site.
Resin Rock supplies UV-stable binder, stone blends, trims and the Rock Crete permeable sub-base, with technical data sheets for the design team. We do not install. Find an installer to be matched with an approved installer, usually within 24 hours, and contractors can apply for Connecticut installer training.
Before you specify permeable resin-bound in Hartford
- Find out whether the site drains to a city storm drain or an MDC combined sewer.
- Check the Section 6.14 exemptions: three units or fewer, or under 2,500 square feet of disturbance that is not part of a larger plan.
- Size storage for the 1.3-inch water quality storm in the 2024 state manual.
- Test infiltration and plan an underdrain where slow-draining clays turn up.
- Ask zoning staff whether the surface counts as permeable for tree canopy requirements.
- Write a winter maintenance plan that uses no sand.
Common questions about permeable resin-bound in Hartford
Does my two-family house need a stormwater plan for a new driveway?
Freestanding one-, two- and three-unit dwellings that are not part of a larger subdivision or plan are exempt from the Section 6.14 stormwater plan. Zoning, driveway and MDC connection rules can still apply, and a permeable driveway still needs a proper open-graded base if it is going to drain.
Can overflow from a permeable surface go into the MDC sewer?
Section 6.14 requires any system that outlets to a drain under MDC control to meet MDC standards and approvals, and MDC's Clean Water Project is working to keep stormwater out of sanitary pipes. Plan for infiltration first, and talk to MDC before designing any overflow connection.
Is permeable pavement recognized in Connecticut's stormwater manual?
Yes. The 2024 Connecticut Stormwater Quality Manual describes permeable pavement as an infiltration practice that can provide retention when designed to exfiltrate. It names porous asphalt, pervious concrete and permeable interlocking pavers as the common types. Resin-bound is not listed, so the design must show it meets the same criteria.
Official sources for Hartford
- Hartford Zoning Regulations, 6.0 Sitework & Landscape (Section 6.14 Stormwater & LID)
- CT DEEP: 2024 Connecticut Stormwater Quality Manual
- MDC Clean Water Project: the five components
- CT DEEP MS4 general permit
Local rules change. We last checked these sources in October 2026. Confirm current requirements with the reviewing agency before you design, and treat this page as a starting point, not engineering or permitting advice.
