Permeable Resin-Bound Surfacing in Pittsburgh, PA

Permeable resin-bound surfacing in Pittsburgh: how Pittsburgh Water bills impervious area, its permeable pavement rule, steep slopes and what the base needs.

Permeable resin-bound surfacing can be part of a Pittsburgh stormwater design when it tops a permeable base such as Rock Crete over a stone bed that City reviewers accept as a managed practice. Pittsburgh Water does not give a stormwater credit for permeable pavement, but it can deduct permeable pavement built with an infiltrating sub-base from the impervious area on your bill. Whether a resin-bound system counts is Pittsburgh Water's decision. Laid over an existing slab, it changes nothing for runoff or for your bill.

Pittsburgh Water (PWSA) bills every property by impervious area, and only about a quarter of the city has separate storm sewers; the rest drains to combined sewers feeding ALCOSAN's regional system. Steep hillsides add their own limits. Those facts decide how, and whether, a permeable section earns its place on a site.

PWSA's fee, its permeable pavement rule and how it treats porous ground

PWSA's stormwater fee is based on impervious area measured from aerial photography. One equivalent residential unit (ERU) is 1,650 square feet; residential parcels fall into three tiers, and non-residential parcels pay per ERU. PWSA's credit program covers practices such as rain gardens and underground storage systems: a residential customer with a qualifying practice drops to the next lower tier, and non-residential properties can receive up to 60% off under the City's 2019 stormwater standards, or up to 45% under the 2016 standards. Credits are renewed every three years with a current photo of the practice.

Permeable pavement is handled differently. PWSA says permeable pavement or pavers designed with a sub-base for stormwater infiltration are not eligible for a credit, but can be deducted from the parcel's impervious area. No PWSA rule names resin-bound surfaces, so whether a resin-bound system counts as permeable pavement is PWSA's call. Expect to document the reservoir, infiltration data and maintenance when you ask for the deduction. Gravel is impervious by default, with case-by-case appeals for gravel built for high permeability, and the City's zoning guidance counts gravel as impervious unless compaction or infiltration tests meet the City Stormwater Design Manual.

Hillsides, combined sewers and three rivers

The separate storm sewer area runs under a joint MS4 permit held by PWSA and the City. Everything else flows to ALCOSAN, whose Clean Water Plan adds regional tunnels along the Ohio, Allegheny and Monongahela rivers, and whose GROW program supports projects that cut flow at the source. Keeping rain out of combined pipes is the main stormwater benefit a permeable section can offer here.

The ground is the harder part. Steep slopes, landslide-prone soils, clay and old fill or undermined areas make concentrated infiltration risky on many hillsides, so the project engineer may call for a geotechnical review, a lined bed with an underdrain, or terraced reservoir cells. An underdrained section provides detention and treatment, not volume reduction. Freeze-thaw cycles are frequent and road salt is heavy, so check base depth against frost and specify vacuum cleaning rather than sanding.

Where it fits in Pittsburgh

  • Non-residential parking lots: every 1,650 square feet of pavement is an ERU on the bill, so replacing part of a lot with permeable pavement that PWSA removes from the billed impervious area is worth evaluating.
  • Projects seeking zoning performance points: Section 915.07 rewards capturing a share of the first two inches of runoff with preferred technologies under the City Stormwater Design Manual.
  • Rowhouse yards and parking pads: if PWSA accepts the permeable section and deducts it, a smaller billed impervious area can move a home into a lower tier.
  • Riverfront trails and plazas: flatter sites where infiltration is more feasible than on the hillsides.

For simple resurfacing of a sound slab, see our Pittsburgh concrete resurfacing page; that work does not change your stormwater fee.

Approvals: City Planning, PWSA and the county

Private stormwater facilities are regulated mainly by the City under its Stormwater Management Code, and PWSA's developer manual sends applicants to the Stormwater Management Officer in the Department of City Planning. PWSA handles sewer and storm connections, and the Allegheny County Conservation District runs the NPDES construction stormwater program. Once the surface is built, ask PWSA separately to remove it from your billed impervious area; permeable pavement is handled that way rather than through the credit program.

Resin Rock supplies UV-stable binder, stone blends, trims and the Rock Crete permeable sub-base, with technical data sheets for the review package. We do not install. Find an installer to be matched with an approved installer, usually within 24 hours.

Before you specify permeable resin-bound in Pittsburgh

  • Look up the parcel's impervious area and ERUs in PWSA's Stormwater Fee Finder.
  • Get a geotechnical opinion before infiltrating on or near a slope.
  • Confirm whether the site drains to a combined sewer or the separate storm system.
  • Document the sub-base design, reservoir volume and infiltration tests when you ask PWSA to deduct the area.
  • Plan routine vacuum cleaning, and renew any credit for a separate practice, such as a rain garden, every three years.

Common questions about permeable resin-bound in Pittsburgh

Will PWSA count a permeable resin-bound driveway as pervious?

Possibly. No PWSA rule names resin-bound, but PWSA says permeable pavement or pavers built with a sub-base for infiltration can be deducted from a parcel's impervious area, though they do not earn a credit. Expect to show the base design, infiltration data and maintenance, and treat any change to your billed area as PWSA's decision.

How much can permeable pavement reduce a commercial stormwater bill?

Permeable pavement does not earn a PWSA credit. Instead, permeable pavement built with an infiltrating sub-base can be deducted from the impervious area PWSA bills, and non-residential bills are based on that area in 1,650-square-foot ERUs. Credits of up to 60% under the City's 2019 standards, or 45% under the 2016 standards, apply to other practices such as rain gardens and underground storage.

Is infiltration safe on a Pittsburgh hillside?

Sometimes not. Concentrating water in a stone bed on a steep or unstable slope can add risk, so the project engineer should get a geotechnical review first. On those sites, a lined bed with an underdrain or terraced cells can still provide detention and treatment under a permeable surface without pushing water into the slope.

Official sources for Pittsburgh

Local rules change. We last checked these sources in October 2026. Confirm current requirements with the reviewing agency before you design, and treat this page as a starting point, not engineering or permitting advice.

How a permeable resin-bound build-up handles rain

The surface you see is only the top layer. Whether a resin-bound area works as permeable pavement depends on everything underneath it.

  1. Resin-bound wearing course. Natural aggregate coated in UV-stable resin and hand troweled. Rain passes through the open voids between the stones.
  2. Permeable base. An open-graded base, designed by the project engineer, that carries the load and keeps water moving down. Ask us where Rock Crete fits your build-up.
  3. Stone reservoir. Clean, open-graded stone sized to hold the design storm while it soaks away.
  4. Subgrade or underdrain. Water infiltrates the native soil, or leaves through a perforated underdrain where soils are tight or groundwater is high.

Laid straight over solid concrete or asphalt, resin-bound still drains through its own surface, but the water then runs off the slab beneath it. That is a resurfacing job, not a stormwater control, and it should not be submitted as one. Product details are in our technical data sheets.

Cross-section of a permeable resin-bound build-up Rain passes down through four numbered layers: the resin-bound wearing course, a permeable base, a stone reservoir, and the native subgrade with an optional underdrain. 1 2 3 4
Illustrative only. Layer depths, the reservoir and any underdrain are set by the project engineer for each site.