Raleigh names permeable pavement in its development code and helps pay for it on existing properties, so permeable resin-bound surfacing has a real path here, but only as a complete system: a porous surface over an engineered stone base that soaks water into the ground or releases it slowly, designed to state criteria and accepted by the City's stormwater staff.
A resin-bound layer bonded onto an existing driveway or patio does not qualify. Rain that passes through it still runs off the slab underneath, and Raleigh's fee rules already treat concrete, paver and gravel patios as impervious. The sections below cover the development rules, the Rainwater Rewards program and the soil questions that decide the base.
UDO Article 9.2 and the Neuse nitrogen limit
Raleigh's stormwater rules sit in Article 9.2 of the Unified Development Ordinance, which requires stormwater control measures, watercourse buffers or both before land disturbance or subdivision. The code lists permeable pavement as a primary stormwater control measure, provided it is designed, built and maintained to the NCDEQ minimum design criteria. Section 9.2.2 caps nitrogen export from new development or expansion at 3.6 pounds per acre per year, allows the balance to be offset through payments to the state Riparian Buffer Restoration Fund or private mitigation banks, and holds peak runoff for the 2-year and 10-year storms to pre-development rates.
The City's Stormwater Design Manual and related UDO changes took effect on November 2, 2024. Parts of north Raleigh drain to Falls Lake, which has its own nutrient strategy on top of the Neuse rules, so confirm early which applies to the site.
Under the state criteria, the finished permeable surface must show an infiltration rate of at least 50 inches per hour, and any surface other than pavers, pervious concrete or porous asphalt must be backed by evidence of long-term hydraulic and structural performance.
Piedmont clay, sandier ground to the east and the stone reservoir
Raleigh sits near the eastern edge of the Piedmont, with clay subsoils across much of the city and sandier ground toward eastern Wake County. That range is why the state criteria require a site-specific soil investigation for any infiltrating design and at least two feet between the bottom of the subgrade and the seasonal high water table, reducible to one foot only with a hydrogeologic evaluation. If soils cannot drain the design volume within 72 hours, an underdrained detention design is the fallback.
Two more criteria often decide residential and small commercial jobs. The soil subgrade must be nearly flat, at 2 percent or less, so sloping drives in older neighborhoods may need terraces under the surface. Run-on from other hard surfaces is limited to a 1:1 ratio, so a permeable strip at the foot of a long concrete drive can only accept so much. Older commercial lots along corridors such as Capital Boulevard should be checked for contaminated fill before anyone plans infiltration.
Where it fits in Raleigh
- Homeowner driveways and walkways inside city limits, the uses Raleigh Rainwater Rewards names for permeable pavement.
- Downtown and Glenwood South patios and courtyards, where a primary SCM has to fit inside a small footprint.
- Nonprofit and place-of-worship driveways and walkways, which may fit the Rainwater Rewards subsidy track if City staff approve the design.
- Campus and government grounds with pedestrian plazas and a facilities team to handle sweeping.
Rainwater Rewards, permits and Resin Rock's role
For existing properties, Raleigh Rainwater Rewards lists permeable pavement for driveways and walkways among its eligible projects. The standard program pays 90 percent of project costs, and a subsidy track pays 100 percent for owners in underserved communities, nonprofits and places of worship. Properties must be inside city limits and pay the stormwater fee, and the process starts with a consultation request and a site visit. Whether a resin-bound design qualifies is the City's decision.
For development, permeable pavement is reviewed with the site's stormwater plan under Article 9.2 and the design manual. Resin Rock supplies binder, stone blends, trims and the Rock Crete permeable sub-base, publishes technical data sheets for the review package, and trains and approves installers; we do not install. To refinish existing concrete instead, see concrete resurfacing in Raleigh. For a permeable build, request an approved installer.
Before you specify permeable resin-bound in Raleigh
- Confirm whether the site is under the Neuse rules alone or the Falls Lake strategy as well.
- Run the nitrogen loading calculation and decide whether an offset payment is needed.
- Test soils and the seasonal high water table at the planned base depth.
- Keep the subgrade at 2 percent or less and run-on at no more than 1:1.
- For an existing home, request a Rainwater Rewards consultation before buying materials.
Common questions about permeable resin-bound in Raleigh
Will Raleigh Rainwater Rewards pay for a permeable resin-bound driveway?
Permeable pavement for driveways and walkways is an eligible project type, and the standard program pays 90 percent of project costs, with a 100 percent subsidy track for some owners. Whether a particular surface, design and contractor qualify is decided by City staff after a consultation and site visit, so start there before ordering anything.
Does Raleigh count my patio as impervious for the stormwater fee?
Yes. Raleigh's fee page lists patios of concrete, pavers or gravel, along with driveways, sidewalks and artificial turf, as impervious surface, and it does not describe a reduction for permeable pavement. Ask the stormwater utility how an engineered permeable section would be measured before assuming your fee will change.
Is resin-bound accepted as a primary SCM under the UDO?
The UDO lists permeable pavement as a primary stormwater control measure when it meets NCDEQ minimum design criteria. Those criteria name pavers, pervious concrete and porous asphalt, and allow other surfaces only with proof of long-term hydraulic and structural performance. Your engineer should raise a resin-bound proposal with City stormwater reviewers before design is far along.
Official sources for Raleigh
- Raleigh UDO Article 9.2: Stormwater Management
- City of Raleigh: Raleigh Rainwater Rewards
- City of Raleigh: Stormwater Design Manual
Local rules change. We last checked these sources in October 2026. Confirm current requirements with the reviewing agency before you design, and treat this page as a starting point, not engineering or permitting advice.