📍 Distributing from 7 Locations!
🏆 #1 Distributor in North America

Permeable Resin-Bound Surfacing in Wilmington, NC

Permeable resin-bound surfacing in Wilmington: high water table limits, the City's permeable pavement permit path, and creek rebates for commercial sites.

Permeable resin-bound surfacing can earn stormwater credit in Wilmington when it is part of an engineered permeable pavement system accepted through the City's stormwater review, and the City already has a permit path and an operation and maintenance agreement written for permeable pavements. The deciding factor is usually groundwater, which sits close to the surface across much of the city.

If the plan is to coat an existing concrete drive or asphalt lot, expect no stormwater credit. Water that passes the resin-bound layer still runs across the slab beneath it and into the drains that feed the Cape Fear River and the tidal creeks. Everything here assumes a new permeable base designed by an engineer.

Wilmington's own stormwater permit and the coastal rules behind it

Since its ordinance took effect on November 1, 2009, the City of Wilmington has run its own stormwater permit process for many projects inside city limits, in place of the process administered by NCDEQ's Division of Energy, Mineral and Land Resources. Permits are required for new development, redevelopment and expansion of existing development, through either a Full Stormwater Review or a Drainage Plan Review. Projects proposing permeable pavements for credit submit the state SCM supplement, and the City publishes an operation and maintenance agreement specifically for permeable pavements.

The state framework still applies. North Carolina's coastal stormwater rule covers the 20 coastal counties, and Chapter C-5 of the NCDEQ Stormwater Design Manual says the built-upon area credit for infiltrating pavement cannot be used to escape coastal permit requirements, because the pavement must still be reviewed against the design criteria. C-5 sets a surface infiltration rate of at least 50 inches per hour and asks for proof of long-term performance for surfaces other than pavers, pervious concrete or porous asphalt.

Standards are changing locally too. The City says it will move from a Phase II to a Phase I NPDES permit with added requirements, and it is rewriting its Technical Standards Manual, including a stormwater chapter that was open for public comment through June 2026. Check which version applies on your submittal date.

Sand, shallow groundwater and tides: base design questions

Wilmington's sandy soils often drain well; the constraint is the seasonal high water table. C-5 requires at least two feet between the bottom of an infiltrating base and the seasonal high water table, reducible to one foot with a hydrogeologic evaluation, and one foot for a detention design. On low sites that usually means a shallow reservoir, a raised grade or an underdrain. An impermeable liner can isolate a detention base where groundwater or contamination is a concern, but it lowers the TSS removal credit from 85 to 70 percent.

Tides and tropical storms add a separate problem. Low streets near the river and creek mouths flood from the downstream side, and no permeable surface helps once the ground is saturated or under water. Outlets should be checked for backwater conditions, and wind-blown sand on the surface is a clogging risk that calls for regular vacuum sweeping.

Where it fits in Wilmington

  • Commercial and mixed-use sites in the Bradley Creek and Hewletts Creek watersheds, where the City's cost-share program supports permeable pavement retrofits.
  • HOA common areas and amenity parking in those watersheds and in areas draining to the Intracoastal Waterway.
  • Downtown courtyards and side yards where a small permeable footprint can take roof downspouts, subject to any historic district review.
  • Medical office, retail and campus parking along the College Road and Military Cutoff corridors, with permeable stalls beside conventional drive aisles.

Permitting, rebates and supply in Wilmington

Start with the City's stormwater permit staff: confirm the review track, whether permeable pavement will be counted for credit, and what the permeable pavement O&M agreement will ask of the owner. Bring seasonal high water table data, borings, the reservoir and outlet design, and manufacturer data on surface infiltration.

For retrofits, Heal Our Waterways offers a first-come rebate for commercial, mixed-use and high-density properties and HOA common areas in the Bradley Creek, Hewletts Creek and connected Intracoastal Waterway watersheds. It lists permeable pavement among the large-scale practices it supports, with rebates up to $20,000 based on project type and size. The residential full-funding track does not cover permeable pavement.

Resin Rock does not install. We supply binder, aggregate blends, trims and the Rock Crete permeable sub-base, and we train and approve installers through our North Carolina installer training. When the design is settled, request an approved installer.

Before you specify permeable resin-bound in Wilmington

  • Get seasonal high water table data at the proposed base location.
  • Confirm with City stormwater staff whether the permeable section will be counted for credit.
  • Review the City's permeable pavement O&M agreement with the owner before design.
  • Check whether the site drains to Bradley Creek, Hewletts Creek or the Intracoastal Waterway.
  • Check outlets for tidal backwater and plan sweeping for wind-blown sand.

Common questions about permeable resin-bound in Wilmington

Does Wilmington charge a lower stormwater fee for permeable pavement?

Wilmington bills $9.27 a month for every ERU of 2,500 square feet of impervious surface, and single-family homes pay a flat one-ERU rate. The City's billing page does not describe a reduction for permeable pavement. Ask Stormwater Services how an engineered permeable section would be measured; an overlay on existing concrete stays impervious.

Can I get a Heal Our Waterways rebate for permeable resin-bound?

Possibly, if the property is commercial, mixed-use, high-density or an HOA common area in the Bradley Creek, Hewletts Creek or connected Intracoastal Waterway watersheds. The cost-share track lists permeable pavement among its large-scale practices, with rebates up to $20,000 based on project type and size. The residential full-funding track does not fund permeable pavement.

Is the water table too high for permeable pavement on my lot?

That depends on boring data, not the neighborhood. The state criteria call for two feet of separation below an infiltrating base, or one foot with a hydrogeologic evaluation, and one foot for a detention design. Many low-lying lots end up with a shallower, underdrained reservoir. An engineer should establish the seasonal high water table before design.

Official sources for Wilmington

Local rules change. We last checked these sources in October 2026. Confirm current requirements with the reviewing agency before you design, and treat this page as a starting point, not engineering or permitting advice.

How a permeable resin-bound build-up handles rain

The surface you see is only the top layer. Whether a resin-bound area works as permeable pavement depends on everything underneath it.

  1. Resin-bound wearing course. Natural aggregate coated in UV-stable resin and hand troweled. Rain passes through the open voids between the stones.
  2. Permeable base. An open-graded base, designed by the project engineer, that carries the load and keeps water moving down. Ask us where Rock Crete fits your build-up.
  3. Stone reservoir. Clean, open-graded stone sized to hold the design storm while it soaks away.
  4. Subgrade or underdrain. Water infiltrates the native soil, or leaves through a perforated underdrain where soils are tight or groundwater is high.

Laid straight over solid concrete or asphalt, resin-bound still drains through its own surface, but the water then runs off the slab beneath it. That is a resurfacing job, not a stormwater control, and it should not be submitted as one. Product details are in our technical data sheets.

Cross-section of a permeable resin-bound build-up Rain passes down through four numbered layers: the resin-bound wearing course, a permeable base, a stone reservoir, and the native subgrade with an optional underdrain. 1 2 3 4
Illustrative only. Layer depths, the reservoir and any underdrain are set by the project engineer for each site.

Send us the site plan for your Wilmington project

Share the area, the use and what your reviewer needs. We will confirm the resin-bound system, send the data sheets and put you in touch with an approved installer.